Construction Pictures
Clearing the Site.
Ground Zero.
Digging the Utility Trench.
Lighting Bollard.
Road construction: 1,
2,
3.
Laying the foundation.
Telescope footer.
Pouring the pier.
The slab has been poured.
Telescope pier, from inside.
Sidewalk.
Framing: 1,
2,
3,
4,
5,
6
Fiber Optic Cable.
Warm room window.
Dome construction: 1,
2,
3,
4
Completed exterior.
Telescope arrival.
Gently, now....
Out of the box!.
On the Pier.
The Proud Papa.
Back to my Home Page.
D. Briotta (briotta@ithaca.edu)
Physics Department)
Ithaca College)