Here is a short slide show "movie" of the "new" IC PT facilities in Rochester. Teaching and research labs are being constructed over the summer and should be ready for students in the fall for AY 2006-07.
| Rochester PT site "PhotoStory" movie Windows Media Video - Size: 2 MB |