Facilities
Facilities currently under construction include:
Field House
This 130,000-square-foot main building will hold:
- The Shari and Edward Glazer Arena, a track and field center that will double as a practice facility for lacrosse, field hockey, soccer, baseball, tennis, softball, and football, as well as an events facility
- A strength training facility
- An athletic training facility
- An outdoor plaza
- A press box
- Displays of athletic memorabilia and awards
- A VIP room
- Athletic offices
- Team rooms and locker rooms
Outdoor Stadium with Turf Field
The 81,000-square foot outdoor stadium will feature:
- A multisport synthetic playing surface
- Special lights that will minimize the impact on surrounding neighborhoods while allowing teams to practice and compete at night
- Stadium seating for up to 1,000 spectators
Aquatics Pavilion
The 35,000-square-foot aquatics pavilion will include:
- An eight-lane Olympic-size pool with a diving area and movable bulkheads
- A 15-20-foot-wide pool deck
- A spectator area with nearly 1,000 seats
- A warming tub
- A dividable wet classroom for athletic and academic programs
- A gallery of champions -- the main thoroughfare between the field house and the aquatics pavilion -- that will feature a hall of fame display
- Athletic offices and locker rooms
Outdoor Tennis Facility
Measuring 40,000 square feet, the outdoor tennis facility will feature:
- Six regulation-size courts
- Lighting for evening practice and competition